FARNBOROUGH AEROSPACE CENTRE

Farnborough aerospace overview

This project consisted of the Category A refurbishment of the existing 3 storey office buildings, Warwick House, formerly known as Ascent 1 and York House (Ascent 3).

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting incorporating access roads, roundabouts and parking areas. It is immediately adjacent to Farnborough Airport. Warwick and York House were constructed in the 1990’s and represent 2 buildings within the business park, which will comprise of 75,143sq ft and 45,413sq ft of office space, respectively.

Both buildings were upgraded to achieve a BREEAM Excellent rating.

Works consisted of the following:

  • New glazed curtain walling to main entrance elevations
  • New front and side extensions
  • New ground and first floor ‘infills’ to existing building footprint (Ascent 1)
  • Creation of a glazed ‘Atrium’ to Ascent 1 building
  • Refitted reception areas
  • Full mechanical and electrical upgrades
  • New suspended ceilings
  • Part new and part refurbishment of the raised access flooring systems
  • Refurbished and reconfigured toilet cores
  • Refurbished staircases
  • New lifts with some upgrades of retained lifts
  • Upgrading of the existing roof
  • External hard landscaping

Pebble mill care home

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Premium meet and greet

Works involved the construction of a new build transaction building and vehicle damage recording system (VDRS) building together with associated road and car park reconfiguration works.

Sheringham leisure center

The new facility will replace the existing Splash leisure centre, which will remain open whilst the new centre is built on a different part of the site. The leisure centre will be approximately 3000m² 

Sleeprz hotel, Newcastle

This project involved the construction of a six storey pre-cast concrete framed hotel on the former site of Network Rail‘s Parcel Sorting Office.

Lauder lodge care home civils

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting

Lidle supermarket

The development included the demolition of the former Dyfed Powys Police Station Carmarthen HQ and removal of all asbestos material from the building prior to demolition.

Portland student accommodation

The building faces East, overlooking the City Stadium. The building is being constructed on a brownfield site, and built using a structural steel frame on piled foundations, with a mixture of red and

Park Plaza Bridgend

Total was contracted to build 63,000 ft² of retail outlet on Parc Plaza, a popular commercial development on the outskirts of Bridgend. The units were delivered ahead 

Alton sports center

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Chester care home civils

The proposed care home for elderly people will provide 58 beds laid out in flexible wings, specially designed to deliver the highest standards in living and communal spaces for

Coalvile leisure center

The site is home to a 110-station gym, two pools, sauna, steam room & spa, three fitness studios, clip and climb, three squash courts, an eight course sports hall, an adventure trail and café. Total Group

Cramlington Hospital

Total Group has been appointed as principal contractor on the Northumbria Healthcare NHS Foundation Trust’s new Cramlington Hospital training centre.

Farnborough aerospace

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting

Hornchurch leisure center

The new sports centre will have an internal GIFA 6140m2 across two floors.  The proposed site is adjacent to the original leisure centre which was built in 1956 and will remain operational whilst the new centre is constructed.

Hilton Hotel

The building is located in the City’s Central Conservation Area opposite the Central Railway Station. Total’s understanding of the Hampton by Hilton style brand and the clients deliverables was a major

Kirkleatham groundworks

The Kirkleatham Walled Garden and Catering Academy involved multiple construction projects being undertaken on-site, alongside extensive repairs, restoration and repointing of an existing

Ready to start your project ?

Let's Work Together

Please complete the form below and someone from the Total team will be in touch.

One partner, endless solutions

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Holdings Group

Part of the Total Holdings Group

Scroll to Top