TURNER COURT
Turner court project overview
This project comprised the design and build of an eight storey, steel framed student accommodation block consisting of 275 ensuite bedrooms.
Two separate retail spaces were also provided to the ground floor which is currently let to Tesco and Subway. Total Group provided a full turn-key service, which included all furniture, fixtures and fittings, beds, wardrobes, sofas, white goods and bathroom pods.
The project achieved BREEAM ‘Excellent’, ‘Secured by Design’ and ‘Considerate Constructors’ accreditation. The external elevations are brick with inset coloured panels with a white rendered finish to the inside walls facing an internal courtyard.
The northern part of the building’s single ply membrane roof is Sedum Green roofing assisting in reducing rain water runoff and encouraging bio diversity. The project was completed in August 2013.
South tyneside Hospital
The new energy centre includes both a new boiler house, and a combined heat and power unit (CHP Unit). The unit will make more efficient and effective use of valuable energy resources
Specialist hospital Kent
This project comprised of a 65-bed independent hospital, with associated car parking areas and landscaping. The hospital is split across 4 wards, with each ward offering specialist health services.
Star bucks drive through
The project consists of the construction of a new Starbucks Drive-Thru restaurant for The Giant Storage Group. The proposed location of the scheme constructed within the demise/boundary
Turner court
Two separate retail spaces were also provided to the ground floor which is currently let to Tesco and Subway. Total Group provided a full turn-key service, which included all furniture, fixtures and