What is a method statement

What is a method statement?

It is critical that a comprehensive method statement is in place before the commencement of a demolition, construction, deconstruction or a major refurbishment project. on some occasions, the exterior of a building has to be preserved intact whilst the interior is completely stripped of partitioning, flooring and internal walls ready for refurbishment or redevelopment. This work requires careful control and management and is known as Soft Strip. During this process, temporary propping and structural support systems may be required. Any demolition project will require the application of many issues including:    

  • Working at height including the safe use of scaffolding
  • Access and egress from the demolition site
  • The protection of third parties, such as children, and surrounding structures
  • The isolation of main services
  • The installation of temporary services such as electricity 
  • The identification and removal of asbestos
  • The use of demolition plant and equipment 
  • Effective communication between all workers on the demolition site
  • Effective emergency arrangements 
  • The management of waste materials, both on-site segregation and off-site disposal;
  • The effective coordination of all work activities 
What is a method statement - TOTAL Group

What a method & risk assessment should include

A method statement and  risk assessment should be made by the demolition contractor undertaking the applicable works-this risk assessment will be used to draw up a method statement for inclusion in the health and safety plan. This statement is a safe system of work that identifies the sequence of work required to prevent accidental collapse of the structure.

A written demolition method statement will be required before demolition takes place. The method statement contents will include the following:

  • Details of the method of demolition to be used including the means of preventing premature collapse or the collapse of adjacent buildings and the safe removal of debris from upper levels to prevent overloading due to the debris; 
  • Establishment of exclusion zones and hard-hat areas; clearly marked and with safety barriers or hoardings;
  • The design and method of temporary supports;
  • Details of site access and security 
  • Details of the location of any underground or overhead services
  • Details of protection from falling materials arrangements
  • Details of equipment, including access equipment, required, and any hazardous substances to be used
  • Details and use of high-rise demolition machines and reinforced machine cabs that drivers are not injured  
  • Arrangements for the protection of the public and the construction workforce against noise and whether hazardous substances, such as asbestos or other dust, are likely to be released 
  • Details of the isolation methods for any services which may have been supplied to the site and any temporary services required on the site
  • Details of personal protective equipment, such as hard hats, which must be worn by all personnel on site 
  • First-aid arrangements, emergency and accidents arrangements
  • Arrangements for the separation and disposal of waste
  • Names of site management and those with responsibility for health and safety and the monitoring of the work 
  • The coordination of all work activities on the site; and the expected level of competence of site workers  

Additional risk assessments, such as COSHH, personal protective equipment and material handling, should be appended to the demolition method statement. The isolation of all services ( gas, electricity, and water) which feed the site is essential before any demolition takes place. Contact with the appropriate services provider will be necessary since sites often have a complex of feeds for many of their services. The local authority and surrounding properties also need to be informed tat services are to be isolated.

 

What is demolition?

The process involves Rotational hydraulic shears and rock-beakers attached to specialist excavators are also used to cut or break through wood, cut steel and crush concrete which reduces the structure to a rubble 

What is a premature collapse?

TPremature collapse of these structures is one of the main causes of serious injuries resulting from demolition activities. The most common type of incidents is the lack of planning before commencement

Demolition hazards

If a demolition project is well planned the risks of injury and death can be minimised. It should be emphasised that the planning and execution of a demolition project should only be done by appropriately competent persons.

What is a section 80 demolition notice?

If your considering demolishing an existing building you will need to submit a demolition, Section 80 Notice together with your (RAMS) to your local authority according to section 80 

What is a pre-demolition survey

When a building is to be demolished the (non-domestic) client (usually the property owner) has a duty to provide pre-demolition information to the designer and contractor. This will involve a pre-demolition investigation and survey. 

How to manage asbestos in demolition

One of the key issues arising in demolition these days is asbestos. Widely used in construction projects by previous generations, asbestos is now accepted as the UK’s largest occupational killer and there are strict guidelines for the safe removal 

How to manage a demolition site

Where any redundant building, structure plant has contaminated flammable materials, precautions must be observed to avoid fires and explosions. Specialist advice must be required to identify any residual 

What is manual demolition?

Among the methods, manual demolition is found to be most applicable for most sites, especially for areas located in the urban zone. The safety of the demolition process would greatly depend on the type of procedure used.

What is non explosive demolition?

You do not need explosives for every demolition job. Most people assume that for a demolition to be a demolition there is a need for a kaboom. It does not have to be that way

Structural demolition

Structural demolition is not a walk in the park. Total Group is well placed to deliver a safe, environmentally friendly and a budget wise project. We focus on a process that will assist you to salvage and recycle material for reuse.

What is high risk demolition?

The building contractor needs to make a thorough risk assessment to look for both risks and hazards. Control measures are then implemented to prevent any accident that could be fatal. 

Controlled demolition methods

If you have a large building that requires demolishing, you cannot rely solely on manual demolition to get the project completed. There is only so much that a team of demolition contractors.

Ready to start your project ?

Let's Work Together

Please complete the form below and someone from the Total team will be in touch.

One partner, endless solutions

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Holdings Group

Part of the Total Holdings Group

Scroll to Top