RIVERSIDE GROUP – REFURBISHMENT OF THE QUADRANT (RETIREMENT LIVING COMPLEX)

Total Group undertook refurbishment works across resident kitchens, bathrooms and communal areas across The Quadrant – a live and fully-occupied over 55s retirement living complex based in Leicester.

Riverside carehome refurbishment

Project details:

Client:  Riverside Group

Team:  Total Regen

Type: Refurbishment

Location: Leicester

Project value: £485k

Procurement: Competitive Tender

Project Overview

The Riverside Group is a major provider of affordable housing, care and support services across England and Scotland, with over 52,000 homes in management.

Total Regen was appointed by Riverside to undertake the refurbishment of resident kitchens, bathrooms and communal areas across The Quadrant – a live, fully-occupied over 55s retirement living complex based in Leicester.

Works also included the installation of new windows and doors, new blinds, suspended ceilings, a new fire system and smoke alarms, new radiators, and three new store cupboards. Sensory LED lighting was also implemented throughout communal areas and cupboards.


Total Regen Solution

Working across occupied properties and communal areas, Total Regen ensured minimal disruption to residents and retirement living staff via our unobtrusive, friendly and professional approach. We were acutely mindful of noise levels throughout the project, working to keep the number of operatives working within an individual property to a minimum.

Resident engagement

As well as hosting regular coffee mornings, Total Regen also organised and hosted several excursions for residents as a thank you for their patience and cooperation during the works. These included seaside visits, a trip to Lincoln, a pub carvery, and an afternoon at Leicester Racecourse.

Furthermore, Total Regen carried out additional works for the benefit of residents, including undertaking external landscaping and purchasing a new garden furniture set for the scheme’s shared outdoor area.

Close client relationship

Throughout the project, we enjoyed regular communication with the core project team, holding monthly meetings on site which were attended by the client and the client’s agent. Furthermore, daily liaison with retirement living staff ensured the site team was kept abreast of any events occurring within the scheme, which then allowed us to work around these whilst keeping potentially disruptive works to a minimum.

Per the client’s request, we undertook a number of works additional to the original specification including refurbishing additional properties on the scheme, the relocation of loft hatches from toilet to guest room and remodelling of guest room, creation of new, energy-efficient conservatory space featuring low e-value glass to prevent heat loss, and cleaning of the scheme’s garden space block paving and installation of rotary line

All additional works were seamlessly managed, with labour levels optimised to ensure maximum efficiency.

PROJECT ACHIEVEMENTS

LIVE RETIREMENT LIVING SCHEME – the project took place within a live retirement living environment housing elderly and vulnerable residents. Total Regen’s tidy, communicative approach ensured minimal disruption to residents and retirement living staff throughout the duration of works.

RESIDENT ENGAGEMENT – Total Regen organised and hosted several excursions for residents as a thank you for their patience and cooperation during the works. These included seaside visits in Llandudno and Skegness, a trip to Lincoln, a pub carvery, and an afternoon at Leicester Racecourse.

HEALTH AND SAFETY – excellent health and safety management ensured that this was an accident and incident-free project.

SUSTAINABLE WASTE MANAGEMENT – Total Regen and Riverside are proud to have achieved a recycling rate of 96% throughout this project, with just 4% of waste diverted to landfill

Galanos care home refurbishment

Total Regen was appointed by The Royal British Legion to undertake a significant refurbishment scheme across Galanos House in Warwickshire – one of 6 care homes owned and run by the Legion.

Retirement village refurbishment

In 2018, Total Regen was appointed by the Trust to manage the internal refurbishment and remodeling of its Lovat Fields Retirement Village, based in Milton Keynes.

Riverside retirement village refurbishment

Total Regen was appointed by Riverside to undertake the refurbishment of resident kitchens, bathrooms and communal areas across The Quadrant – a live, fully-occupied over 55s 

Haddon primary school refurbishment

Since its creation in 1976, the school had been confined to one level, with the classrooms separated by curtains resulting in an open-plan design which was noisy and not conducive to

Glenfield hospital refurbishment

Part of the University Hospitals of Leicester NHS Trust, Glenfield Hospital provides a range of services for patients, including nationally recognised medical care for heart

Radford health unit refurbishment

Total Regen was appointed by NHS Property Services to manage a major refurbishment project across Radford Health Centre. The project, which spanned all three floors of the building

University of Sheffield Refurbishment

In 2018, Total Regen was appointed by the university to manage the refurbishment of the its Ella Armitage Building, formerly known as the Sheffield Bioincubator. 

Broadway cinema refurbishment

This refurbishment and alterations project involved the cinema securing Arts Council NPO funding to create a space where the digital and creative industries can collaborate together to drive skill

South tyneside Hospital

The new energy centre includes both a new boiler house, and a combined heat and power unit (CHP Unit). The unit will make more efficient and effective use of valuable energy resources

Specialist hospital Kent

This project comprised of a 65-bed independent hospital, with associated car parking areas and landscaping. The hospital is split across 4 wards, with each ward offering specialist health services. 

Star bucks drive through

The project consists of the construction of a new Starbucks Drive-Thru restaurant for The Giant Storage Group. The proposed location of the scheme constructed within the demise/boundary 

Turner court

Two separate retail spaces were also provided to the ground floor which is currently let to Tesco and Subway. Total Group provided a full turn-key service, which included all furniture, fixtures and

GE gorby office refurbishment

The GE Measurement and Control site at Groby in Leicestershire underwent a major refurbishment following a fire at the premises in 2014. The £2.4 million office refurbishment was a joint delivery

Sexual health clinic refurbishment

All works were undertaken in line with NHS Clinical Standards, with key considerations including accessibility, navigation, and adherence to infection 

Warwick university refurbishment

In 2017 – following a comprehensive tender process – Total Regen was appointed to undertake various construction and refurbishment works across the university’s Westwood

Construction complex case studies

Total Regen are able to offer a complete design & build service package. We have been involved in some of the largest complex construction projects in the United Kingdom

Ready to start your project ?

Let's Work Together

Please complete the form below and someone from the Total team will be in touch.

Scroll to Top