UNIVERSITY OF WARWICK – WESTWOOD CAMPUS REFURBISHMENT

Total Regen was appointed to undertake various construction and refurbishment works across the University of Warwick's Westwood campus.

Warwick university refurbishment - TOTAL GROUP

Project details:

Client:  University of Warwick

Team:  Total Regen

Type: Refurbishment

Location: Warwick

Project value: £1m

Procurement: Competitive Tender

Project Overview

Warwick is one of the UK’s leading universities, with a widely acknowledged reputation for excellence in research and teaching. It is located on the outskirts of Coventry, and on the border of Warwickshire.

In 2017 – following a comprehensive tender process – Total Regen was appointed to undertake various construction and refurbishment works across the university’s Westwood campus. The project entailed the refurbishment of the Westwood cafeteria, the Centre for Lifelong Learning, as well as the creation of an editing suite, green room, family room, toilets and drama room within the Avon building.

Works included decoration, mechanical and electrical installations, joinery and fire-stopping.

Since completing the works, Total Regen has been appointed to undertake multiple other projects across the university, including a £4.2m student accommodation refurbishment scheme.


Total Regen Solution

Live university environment

With over 25,500 students currently studying at the University of Warwick – the majority of whom are based on campus – health, safety and environmental quality was a particularly critical consideration throughout the project. Prior to the commencement of works, a comprehensive risk assessment was undertaken by Total Regen’s site team, identifying, quantifying and recording – and forming a plan to mitigate – associated project risks. The most prominent risks were associated with working adjacent to occupied buildings, electrical works and minor demolition.

All efforts were made in order to minimise disruption to the university’s operations. Works were phased in order to minimise disruption and maximise safety whilst working on this live university campus, with the refurbishment of the campus’s busy cafeteria completed during the summer holidays, and the remainder of works completed afterwards.

Additionally, our site manager monitored the implementation of a rigorous traffic management plan, which ensured deliveries were made via an agreed route outside of the university’s peak times.

Long-term partnership

Throughout the project, we enjoyed a productive working relationship with the university, during which we worked to gain a detailed understanding of its people, processes and values. We focused heavily on helping to maintaining the university’s excellent learning environment. Since completing the works, Total Regen has been appointed to undertake multiple other projects across the university, including the refurbishment of two student accommodation blocks, as well as the replacement of windows within the university’s conference centre.

PROJECT ACHIEVEMENTS

DETAILED SITE KNOWLEDGE – throughout the works, we developed an intimate knowledge of the layout and daily operations of the university, including the university’s Westwood & Science Park, central campus, and surrounding areas. This was achieved through careful, unobtrusive research, analysis and relationship building across the campus

PHASED WORKS – Total Regen ensured minimal disruption to the university’s daily operations by undertaking the refurbishment of Westwood campus’s busy cafeteria during the summer holidays, with the remainder of the works completed afterwards

A COLLABORATIVE & LONG-TERM WORKING RELATIONSHIP – close collaboration between Total Regen and the university, which took the form of regular meetings and a transparent approach, ensured that all parties were kept abreast of programming and operational updates, and any changes that were required due to university activities

Since completing the works, Total Regen has been appointed to undertake multiple projects across the university – a testament to an excellent relationship between the two parties

Galanos care home refurbishment

Total Regen was appointed by The Royal British Legion to undertake a significant refurbishment scheme across Galanos House in Warwickshire – one of 6 care homes owned and run by the Legion.

Retirement village refurbishment

In 2018, Total Regen was appointed by the Trust to manage the internal refurbishment and remodeling of its Lovat Fields Retirement Village, based in Milton Keynes.

Riverside retirement village refurbishment

Total Regen was appointed by Riverside to undertake the refurbishment of resident kitchens, bathrooms and communal areas across The Quadrant – a live, fully-occupied over 55s 

Haddon primary school refurbishment

Since its creation in 1976, the school had been confined to one level, with the classrooms separated by curtains resulting in an open-plan design which was noisy and not conducive to

Glenfield hospital refurbishment

Part of the University Hospitals of Leicester NHS Trust, Glenfield Hospital provides a range of services for patients, including nationally recognised medical care for heart

Radford health unit refurbishment

Total Regen was appointed by NHS Property Services to manage a major refurbishment project across Radford Health Centre. The project, which spanned all three floors of the building

University of Sheffield Refurbishment

In 2018, Total Regen was appointed by the university to manage the refurbishment of the its Ella Armitage Building, formerly known as the Sheffield Bioincubator. 

Broadway cinema refurbishment

This refurbishment and alterations project involved the cinema securing Arts Council NPO funding to create a space where the digital and creative industries can collaborate together to drive skill

South tyneside Hospital

The new energy centre includes both a new boiler house, and a combined heat and power unit (CHP Unit). The unit will make more efficient and effective use of valuable energy resources

Specialist hospital Kent

This project comprised of a 65-bed independent hospital, with associated car parking areas and landscaping. The hospital is split across 4 wards, with each ward offering specialist health services. 

Star bucks drive through

The project consists of the construction of a new Starbucks Drive-Thru restaurant for The Giant Storage Group. The proposed location of the scheme constructed within the demise/boundary 

Turner court

Two separate retail spaces were also provided to the ground floor which is currently let to Tesco and Subway. Total Group provided a full turn-key service, which included all furniture, fixtures and

GE gorby office refurbishment

The GE Measurement and Control site at Groby in Leicestershire underwent a major refurbishment following a fire at the premises in 2014. The £2.4 million office refurbishment was a joint delivery

Sexual health clinic refurbishment

All works were undertaken in line with NHS Clinical Standards, with key considerations including accessibility, navigation, and adherence to infection 

Warwick university refurbishment

In 2017 – following a comprehensive tender process – Total Regen was appointed to undertake various construction and refurbishment works across the university’s Westwood

Construction complex case studies

Total Regen are able to offer a complete design & build service package. We have been involved in some of the largest complex construction projects in the United Kingdom

Ready to start your project ?

Let's Work Together

Please complete the form below and someone from the Total team will be in touch.

Scroll to Top